WTA / Projects / Completed Projects
|
| TETON
OUTPATIENT SURGERY CENTER
|
WTA
was engaged to provide planning, design and construction documents
for this 7000 gsf multi-specialty surgery center to be located
within an existing two story structure. the facility contains
two operating rooms and one minor procedure room. the facility
is adjacent to a new four room 23-hour recovery center.
Location: jackson hole, wyoming
Budget: $1,400,000.00
Contact: Brian smith
Telephone: 307-733-3900
Date of service: 1998
|
   |
| TETON
ORTHOPAEDICS
|
WTA was engaged to provide
planning, design, and construction documents for the physician
group that owned the Teton Outpatient Surgery Center. The
5000 GSF facility was located immediately adjacent to the
surgery center with convenient access to the locker rooms.
Location: Jackson Hole, Wyoming
Budget: $ 1,000,000.00
Contact: Brian Smith
Telephone: 307-733-3900
Date of Service: 1999
|
 |
| TETON
Outpatient recovery center
|
Wta was
engaged to prepare the planning, design and construction documents
for a 2500
gsf 23-hour recovery care center located within an existing
two story structure. the facility contains four patient rooms
and is located adjacent to the new teton orthopaedics surgery
center.
Location: Jackson hole, Wyoming
Budget: $ 350,000.00
Contact: Brian Smith
Telephone: 307-733-3900
Date of Service: 1998
|
 |
| TETON
Orthopaedics mri center
|
WTA was
engaged to prepare the planning, design and construction documents
for a 1.5
Tesla MRI suite that served the immediate needs of Teton
Orthopaedics and the surrounding community. The 1800 SF suite
was located within an existing structure and required extensive
steel shielding to protect adjacent tenants and passersby.
Location: Jackson hole, Wyoming
Budget: $ 1,000,000.00
Contact: Brian Smith
Telephone: 307-733-3900
Date of Service: 1998
|
 |
| WYOMING
ORTHOPAEDIC INSTITUTE
|
WTA was
engaged to provide feasibility analysis, zoning and site analysis,
zoning change
services, planning, programming, design development, construction
documents, interior design and construction administration
services for this project. The project was located on eight
annexed acres on the east side of Casper, Wyoming. The new
33,000 GSF facility contains a 7500 GSF surgery center, 2500
GSF recovery center, 12000 GSF practice for eight surgeons,
4000 GSF of physical therapy space, and a 7000 GSF lower
level for future expansion. The facility was designed for
expansion to include an MRI suite with a 1.5 Tesla magnet.
Location: Casper, Wyoming
Budget: $ 4,800,000.00
Contact: John Bailey, M.D.
Telephone: 307-472-8800
Date of completion: 2001
|
     |
| THE
SURGERY CENTER - HOWLAND
|
WTA was
engaged to provide site and zoning analysis, planning, programming,
design development,
interior design, construction documents and construction
administration services for this project. The new surgery
center occupied 16,000 GSF. The multi-specialty surgery center
was a collaborative effort by 42 surgeons and two local hospitals.
The center has four operating rooms, two GI rooms, one stereo-tactic
room and another minor procedure room. The center was designed
for expansion to include additional operating rooms, medical
office space and ancillary space.
Location: Howland, Ohio
Budget: $2,900,000.00
Contact: Eric Whitacre
Telephone: N/A
Date of Completion: 1997
|
     |
| advanced centers for orthopaedic
surgery & sports medicine
|
WTA
was engaged to provide site and zoning analysis, planning, programming,
design development,
interior design, construction documents and construction administration
services for this project. The new surgery center occupied
5000 GSF of renovated space adjacent to the Orthopaedic practice
and Physical Therapy components of the institute.
Location: Baltimore, Maryland
Budget: $ 950,000.00
Contact: Geoff Failla
Telephone: 443-544-0111
Date of Service: Undetermined
|
 |
| INTERNATIONAL
SURGERY CENTER
|
WTA was
engaged to provide site and zoning analysis, planning, programming,
design development,
interior design, construction documents and construction
administration services for this project. The new surgery
center has two operating rooms and two minor procedure rooms.
The Facility is 8800 GSF and is designed for expansion. This
center is the prototype for the International Surgery Center.
Budget:$1,700,000.00
Contact: Joseph Walters
Telephone: 410-546-0300
Date of Completion: 2001
|
   |
| Mount
Airy Surgery Center
|
WTA was engaged to provide
planning, programming and design development for this efficient
2400 SF eye center adjacent to the existing practice.
Location: Mount Airy, Maryland
Budget: $ 450,000.00
Contact: Craig Flury
Telephone: 410-266-5050
Date of Service: 1999
|
 |
| exeter
orthopaedics
|
WTA was
engaged to provide planning, programming, design development,
interior design,
construction documents and construction administration services
for this project. The new Orthopaedic practice and Physical
Therapy components occupied 9,000 GSF of renovated space,
located within a historical building.
Location: Exeter, New Hampshire
Budget:$ 950,000.00
Contact: Pam Bronson
Telephone: 603-778-8187
Date of Service: 2000
|
 |
| Solga Surgery Center
|
WTA was engaged to provide planning,
programming and design development for this project. The new
5000 GSF urology center included a physician practice space
and a surgery center on the ground floor of an existing facility.
Location: Berlin, Germany
Budget: $ 550,000.00
Contact: Matthias Solga, M.D.
Telephone: 030-99400763
Date of Service: Undetermined
|
 |